road work (copy)

The following highway work is scheduled, weather permitting, in the Culpeper District during the upcoming week. Traffic movements may be restricted and speed limits reduced in work zones. (NEW) or (UPDATE) indicate revisions since last week’s report.

Culpeper District traffic information is also available on Twitter at @VaDOTCulp and on VDOT’s website at http://www.virginiadot.org/travel/travel_alerts/culpeper/default.asp.

Culpeper County

Brandy Station Park and Ride—Park and ride expansion project. Lot closed to parking. Towing enforced. Anticipated completion Nov. 25.

(NEW) Route 522 (Sperryville Pike)—Pipe replacement between Route 748 (Bruces lane and Route 763 (Saint Jameson Road).

• Road reduced to one lane controlled by flagging from 4 p.m. to 7 p.m. Tuesday.

• Road closed to through traffic from 7 p.m. Tuesday to 7 a.m. Wednesday.

• Road will remain reduced to one lane on Wednesday.

• Use Route 784 (Western Outer Loop) to Route 229 (Rixeyville Road) to get around the closure.

Fauquier County

Interstate 66—Ditch cleaning operations in both directions between mile marker 29 and 35. Expect shoulder closures and be alert for workers near the travel lanes Monday through Friday.

Interstate 66—Tree trimming between mile markers 14 and 27. Expect shoulder closures and be alert for workers near the travel lanes Monday through Friday.

(NEW) Interstate 66—Repairing westbound guardrail at mile marker 22. Left lane closed Tuesday.

Route 15/17/29 (Eastern Bypass)—Construction of grade-separated interchange near Route 880 (Lord Fairfax Road). Contractor will maintain 11-foot travel lanes with barrier in place in both directions.

(NEW) Route 28 (Catlett Road)—Inspection of bridge over Cedar Run. Expect alternating lane closures Monday from 8 a.m. to 5 p.m.

(NEW) Route 28 (Catlett Road)—Road work under VDOT permit between Route 661 (Oak Shade Road) and Whipkey Drive. Expect alternating lane closures Monday through Friday from 9 a.m. to 3 p.m.

Route 29 (Lee Highway)—“Cut The Hills” project. Expect nightly northbound lane closures from 7 p.m. to 5 a.m. Sunday through Friday for final project tasks.

Route 643 (Eustace Road)—Rehabilitating bridge over Licking Run. Traffic using temporary road near existing bridge. Use caution in work zone.

Route 643 (Meetze Road)—Pipe work between Route 670 (Old Auburn Road) and Route 674 (Lunsford Road). Expect lane closures controlled by flagging Monday through Friday from 9 a.m. to 3 p.m.

Route 880 (Lord Fairfax Road)—Shoulder closures and intermittent flagging operations near Route 15/17/29 (Eastern Bypass) for Warrenton Southern Interchange project. Be alert for workers near the travel lanes Monday through Friday 7 a.m. to 5 p.m.

Warrenton Park and Ride—Park and ride expansion project. Obey parking restrictions. Towing enforced. Anticipated completion Nov. 8.

Orange County

(NEW) Route 231 (Blue Ridge Turnpike)—Paving operations between Route 655 (Weyburn Road) and Liberty Mills Road. Expect lane closures from 7 p.m. to 7 a.m. Thursday and Friday.

(NEW) Route 522 (Zachary Taylor Highway)—Resurfacing operations between Route 20 (Constitution Highway) and Route 663 (True Blue Road). Expect alternating lane closures Monday through Wednesday from 7 a.m. to 7 p.m.

Rappahannock County

Route 211 (Lee Highway)—Vegetation control from Sperryville to Rediviva. Right lane closed Monday and Tuesday from 7 a.m. to 3:30 p.m.

Route 522 (Sperryville Pike)—Vegetation control between Route 231 (F T Valley Road) and the Culpeper County line. Expect alternating lane closures Monday through Thursday from 7 a.m. to 3:30 p.m.

Get the latest news in our Headlines newsletter in your inbox each day with the top stories.

* I understand and agree that registration on or use of this site constitutes agreement to its user agreement and privacy policy.

Recommended for you